any damage short of the ship sinking will be repaired on the first day of every new month. this post is for tracking what has been damaged throughout the month.
Last day of November, the following disappear: hinges from a morgue door with the door on the floor a chair from Topy Most of the drink umbrellas from the pool bar a number of salon supplies from Calgona, including lots of nail polish
STRIPPING
hinges from a morgue door with the door on the floor
a chair from Topy
Most of the drink umbrellas from the pool bar
a number of salon supplies from Calgona, including lots of nail polish